UZIN MK 200 elastic adhesive for wood flooring
Original price was: 145.50€.129.90€Current price is: 129.90€. /tk
Product Code: LIIMUZINMK200 Package: 16kg
UZIN MK 200 One-component STP Parquet Adhesive Solvent-free and water-free, highly elastic parquet adhesive
Description A one-component adhesive with silane end groups, an energy-absorbing adhesive tape with a long processing time. It is particularly suitable for gluing moisture-sensitive wood parquet.
Suitable for the installation of the following wooden floors:
► Solid wood parquet
► Strip parquet 16–22 mm
► Multilayer parquet / ready-to-install parquet
► Mosaic parquet
► Tongue and groove connection exotic wood parquet
Suitable substrates:
► Substrates with sufficient strength
► Cement and plaster substrates, concrete
► V100 particleboard, concrete substrates
► Underfloor heating
► All UZIN insulating underlays designed for tongue and groove parquet installation
Product Features/Advantages One-component, moisture-curing STP adhesive. Thanks to its excellent flow properties and long processing time, the product is easy to use. UZIN MK 200 hardens quickly, and work can be resumed shortly after the floor is installed. The product’s good filling properties and rapid curing ensure strong adhesion, the surface can be leveled, and the floor can be finished in just 48 hours.
Composition: silane-terminated prepolymers, mineral fillers, additives.
► Easy to apply
► Strong adhesive tape
► Processing time about 30–40 min
► Fast adhesion
► Very good filling properties
► Energy-absorbing adhesive tape
► Universal usability
► Removing residues from the floor is very easy
► Water-free, no risk of swelling
► EMICODE EC 1 R – very low emission level
► Solvent-free parquet adhesive containing methoxysilane
Technical data Packaging: plastic can Package dimensions: 16 kg
Shelf life: min 6 months
Color: beige
Consumption: about 1300 g/m2
Processing temperature: min 15 °C on the floor Shelf life after opening: none
* Drying time: about 30–40 min
* Load-bearing capacity: about 12 hours
* Leveling/coating: about 24 hours
* Final strength: 5–7 days at 20 °C and 65% relative humidity.